翻訳と辞書
Words near each other
・ Honk Toot Suite
・ Honk Your Horn
・ HONK!
・ Honk!
・ Hongxia Liu
・ Hongxian
・ Hongxing
・ Hongxing District
・ Hongxing Subdistrict, Baoding
・ Hongxing, Harbin
・ Hongxing, Mingshan County
・ Hongxing, Tibet
・ Hongya
・ Hongya County
・ Hongyan
Hongyanhe Nuclear Power Plant
・ Hongyipao
・ Hongyuan
・ Hongyuan Airport
・ Hongyuan County
・ Hongyuan Securities
・ Hongyundaodao Station
・ Hongze
・ Hongze County
・ Hongze Lake
・ Hongzhi Emperor
・ Hongzhi Zhengjue
・ Hongzhou
・ Hongzhou (historical prefecture)
・ Hongzhou school


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Hongyanhe Nuclear Power Plant : ウィキペディア英語版
Hongyanhe Nuclear Power Plant

The Hongyanhe Nuclear Power Plant (红沿河核电站) is one of the newest Nuclear power plants in the world. It is located in Donggang Town, Wafangdian in the Liaoning Province of China. The site is within the Prefecture-level city of Dalian, north of Dalian City proper. The first unit started commercial operations in June 2013. The second in February 2014. Construction is underway on another two 1,000 megawatt CPR-1000 pressurized water reactors.〔

The CPR-1000 is a PWR design developed by China from the Areva-designed PWRs at the Daya Bay Nuclear Power Plant.
==Progress==
The project was approved by the National Development and Reform Commission in April 2006, and projected to cost 23 billion yuan ($2.88 billion USD) for the first two units. The cost will be shared between the China Power Investment Corporation, the China General Nuclear Power Group and two Liaoning companies. Liaoning Hongyanhe Nuclear Power Co. Ltd. is managing the construction and will be the operator of the plant once it goes online.
Construction started in summer of 2006 with excavation of two large holes that will have the reactors put in them and a containment built around them. 'First concrete' for the first unit was poured in August 2007. 'Ground breaking' ceremony was held on 28 July 2010 for starting the work of two 1000 MWe CPR-1000 pressurized water reactors of phase II.
On 17 February 2013 Hongyanhe 1 was connected to the grid, having started criticality testing on 16 January 2013.
It began commercial operation on 6 June.〔
On 23 November 2013 Hongyanhe 2 was connected to the grid.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Hongyanhe Nuclear Power Plant」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.